August 18
Inspection of Turbin flowmeters. Visual and Dimensional and Functional test was performed. All the relevant certificates were reviewed.
August 18
Inspection of corn on board a ship in SAO FRANCISCO do SUL, Brazil. The inspector was present before, during, and after the loading process. The hose was checked. TPI was present during the fumigation and disinfection process.
August 18
BOP inspection in the shop. The factory test was performed on the full assembled unit . Components such as annular blowout preventer and double ram blowout preventer was checked. Hydrostatic test was performed. Paintiong and dimensional check was performed.